Steel tube scaffolding
Related recommendations : Collapsible Scaffolding Erect scaffolding Dismantle Scaffolding
Steel tube scaffolding, also known as scaffold pipe assembly and disassembly, flexible installation, high height, sturdy and durable, with multiple turnover times; It is widely used in construction projects due to its simple processing, low initial investment cost, and relatively economical nature. In addition to being used for scaffolding, it can also be used for setting up derricks, loading platforms, and overpasses. However, there are also disadvantages such as fasteners (especially screws and nuts) being easily lost and vulnerable, significant differences in bolt tightening, and nodes having eccentric or intersecting distances between force lines. The components are as follows:
1. Fasteners
It is a connecting piece between steel pipes, with two types: malleable cast iron fasteners and steel plate building fasteners. There are three basic forms of it.
(a) Right angle fasteners are used to connect two vertically intersecting steel pipes, relying on the frictional force between the fastener and the surface of the steel pipe to transmit the load.
(b) Rotary fasteners are used to connect two intersecting steel pipes of arbitrary degrees.
(c) Docking fasteners are used to connect two steel pipes for docking and lengthening.
2. Steel pipe
Generally, steel pipes with a diameter of 48mm × 3.5mm or seamless steel pipes are used, and welded steel pipes with an outer diameter of 50mm-51mm and a wall thickness of 3mm-4mm can also be used According to the different positions and functions of steel pipes in scaffolding, they can be divided into upright poles, longitudinal horizontal poles, transverse horizontal poles, wall connecting poles, diagonal braces, horizontal diagonal braces, etc.
When using Steel tube scaffolding, it is necessary to regularly clean up the materials, bricks, concrete blocks, and other debris accumulated in the dangerous areas of the scaffolding pipes, and to have certain restrictions on the materials stacked on the scaffolding pipes, and not to stack them beyond the load. Always observe whether there is any deviation in the overall or local structure of the scaffold steel pipes, especially whether there is any looseness or deviation at the connections of the scaffold pipes. If there is any abnormality, timely maintenance and reinforcement should be carried out.
The benefits of galvanized scaffolding
Galvanized scaffolding (i.e. scaffolding with galvanized surface treatment) has signific ...
2025-07-24
Does the construction and dismantling of mobile scaffolding require special training?
The construction and dismantling of mobile scaffolding must undergo special training, wh ...
2025-07-24
How to choose a suitable mobile scaffold to improve the efficiency of construction and dismantling?
Choosing a suitable mobile scaffold is the foundation for improving the efficiency of co ...
2025-07-24
What are some tips to quickly complete the construction and dismantling of mobile scaffolding?
To quickly complete the construction and dismantling of mobile scaffolding, it is necess ...
2025-07-24